Thanks everyone for the excitement and well wishes for us on Jonesy #2. I went to the specialist twice last week. I already had an appt to talk about my glucose intolerance and they drew blood to make sure my hormone levels were good. I don't have to do anything right now about the glucose except excersise and try to watch what I eat. No special diet yet though. I will be tested for gestational diabetes earlier than most and I will likely have it. I went back on Friday to have blood drawn to make sure my HCG levels doubled in 48hrs. On Tues they were 500 and Friday 1500 so that was very good to hear. We scheduled an ultrasound for March 13 to take a peek at our little bean. If feels like its taking forever to get here!
My friend Kristin was so excited for us she got me a bouquet of pink/blue balloons with a big baby one balloon. It was so thoughful of her!

My friend from school Cindi turned 30 on 2/21 so they got a party bus to take everyone clubbing. I had never been on a party bus before but it was a lot of fun. I had just found out about the baby so I enjoyed it as my last night out for at least a year. Some of my other girlfriends were at Skky Bar in downtown so that was fun to see them.

Silly Jones monkey's with Grandma
Jensen and the girls play so well together for hours and they all love being at Grandma and Grandpa's house.
Quick update on the house mess. Jeff finished the the grinding on the hall floor thank goodness and I'm still cleaning up the mess. Even though we masked it off dust got everywhere and I even had to empty out my cabinets and wash all my dishes etc because they had dust on them grrr! Its done though and now we can move on to tiling. If we can only have a weekend free to do it!!
This is what the floor looked like with the the 30yr old tile mortar stuck to it. It might be hard to tell the difference but that stuff was really thick and stubborn.

Nice and smooth after the grinding

Poor Jeff has been working crazy hours trying to move servers and do big updates at work. Last week he went in at 2am 3 nights then 10pm Thurs-1pm Friday. He did get somewhat of a promotion recently. Instead of an IT engineer at Teleflora, he is now an IT architect which I think means he designs instead of builds although he is doing some engineering too. I'm proud of him! Lets just say though that he's kinda tired and grumpy and doesn't want to hear my plans for working on the house!